Lower Snake River Juvenile Salmon Migration Feasibility Report/Environmental Impact Statement. Appendix C: Water Quality

Abstract

This Final Feasibility Report/Environmental Impact Statement (RE/ElS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower-Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration as the recommended plan (preferred alternative) and explains the process for selecting that alternative.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 2002
Accession Number
ADA412294

Entities

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Birds
  • Cells
  • Chemical Synthesis
  • Chemistry
  • Eutrophication
  • Fish
  • Fisheries
  • Habitats
  • Health Services
  • Medical Personnel
  • Wildlife

Readers

  • Environmental Engineering.
  • Hydraulic Engineering.
  • Life Cycle Cost Analysis