LSC (X) Logistics Planning Support, Task 1 Requirements Definition
Abstract
The Office of Naval Research (ONR) has a requirement to develop and evaluate supportability alternatives and to develop a support plan for the LSC (X) project. The LSC (X), commonly known as X-Craft, is a high-speed littoral vessel that is being built for the purpose of experimentation and testing. The X-Craft is under construction and is expected to be delivered to ONR approximately October 2004. A support plan is necessary to ensure the X-Craft is properly configured and supported for operational employment. During the early stage after vessel delivery, there is a requirement to manage this plan through a transition period until the designated support manager is under contract and/or provided with the resources to execute the plan.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 12, 2004
- Accession Number
- ADA421923
Entities
People
- Benjamin C. Ertel
- John Scalzo
Organizations
- Booz Allen Hamilton