Little Dell Lake, Salt Lake City Streams, Utah, Embankment Criteria and Performance Report
Abstract
This report fulfills the requirements of the Department of the Army, U. S. Army Corps of Engineers regulation titled, "Embankment Criteria and Performance Report" (ER 1110-2-1901) dated 31 December 1981. The purpose of the report is to provide a summary of significant design data, specification requirements, construction equipment, construction procedures, construction experiences, field control and record control test data, and to document embankment performance as determined by observations, inspections and instrumentation readings. The report provides the significant as-built embankment information needed by the operators and engineers to (1) familiarize themselves with the project, (2) evaluate and predict the embankment performance particularly in the event of unsatisfactory or abnormal behavior and (3) provide guidance for designing comparable future projects. Portions of this report may also be used to provide information for the embankment portion of Periodic Inspection Reports (ER 1110-2-100). Portions of this Embankment Criteria and Performance Report were prepared by the project Geotechnical (Embankment) Engineer, Project Geologist, the Instrumentation Engineer, and Sacramento District, Geotechnical Branch, Soil Design Section and Geology Section. The report was reviewed by the Sacramento District Geotechnical Branch, Soil Design Section and the Geology Section.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1994
- Accession Number
- ADA425243
Entities
Organizations
- Sacramento District, U.S. Army Corps of Engineers