Phase I Environmental Investigation Report, Fort Benjamin Harrison, Volume 1 of 2 Marion County, Indiana

Abstract

This report was prepared by Harding Lawson Associates (HLA) for the U.S. Army Environmental Center (USAEC) to present the results of a Phase I Environmental Investigation (EI)' performed at Fort Benjamin Harrison (FBH) during late 1993 through early 1994. This investigation concerned several areas requiring environmental evaluation (AREEs) identified for investigation in the Enhanced Preliminary Assessment conducted by Roy F. Weston, Inc. (Weston), for the U.S. Army Soldier Support Center (USASSC) at FBH. The Phase I EI also involved other areas that were not listed in the Enhanced Preliminary Assessment but were requested for investigation by the U.S. Environmental Protection Agency (EPA) Region V. The following sections of this executive summary describe site background, provide an overview of the EI process at FBH, summarize the Phase I EI, and provide conclusions and recommendations from the Phase I investigation.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1995
Accession Number
ADA427064

Tags

Communities of Interest

  • Biomedical
  • Cyber

DTIC Thesaurus Topics

  • Alkanes
  • Alkenes
  • Birds
  • Chemical Elements
  • Chemical Synthesis
  • Chemistry
  • Health Services
  • Hydrocarbon Fuels
  • Medical Personnel
  • Organic Chemistry

Readers

  • Environmental Remediation and Restoration.