Integrated Installation Team Standard Process Manual. Revision 1

Abstract

This Integrated Installation Team Standard Process Manual provides policy-related process management guidelines for all codes and teams of Space and Naval Warfare Systems Center, San Diego (SSC San Diego) involved in advance planning and executing afloat Command, Control, Communications, Computers, Surveillance, and Reconnaissance (C4ISR) alteration installations. It is to be used as an indoctrination tool, a training aid, and a timeline and event-oriented guide. C4ISR alterations include permanent Ship Alterations (SHIPALTs), Temporary ship Alterations (TEMPALTs), software installations, field changes (FC), etc., and any system upgrades or installations to surface ships and submarines.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 2001
Accession Number
ADA431533

Tags

Communities of Interest

  • C4I
  • Ground and Sea Platforms
  • Space

DTIC Thesaurus Topics

  • Business Administration
  • Computers
  • Contracts
  • Cost Estimates
  • Electronic Mail
  • Employment
  • Engineering
  • Engineers
  • Logistics
  • Management Personnel
  • Naval Warfare
  • Navy
  • Organizational Structure
  • Personnel Management
  • Standards
  • Uss John C. Stennis
  • Warfare

Fields of Study

  • Engineering

Readers

  • Computational Modeling and Simulation
  • Maritime and Naval Warfare Studies
  • Naval Architecture and Marine Engineering.

Technology Areas

  • Fully Networked C3
  • Fully Networked C3 - Command and Control
  • Space