Decision Analysis Method for Air Mobility Beddown Planning Scenarios
Abstract
Currently at Air Mobility Command, Plans and Programming, Requirements Division (AMC/A75R), infrastructure requirements for a proposed permanent beddown location are accomplished through corporate knowledge and manual lookup. With the loss of corporate knowledge in the foreseeable future, AMC/A75R is would like to capture this knowledge base in an information system. This research developed a spreadsheet analysis tool that takes hard requirements and compares them with existing capabilities at a given location. Through gap analysis, the tool produced infrastructure requirement shortfalls and associated costs to satisfy the shortfalls.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 2005
- Accession Number
- ADA434204
Entities
People
- Jacob M. Salmond
Organizations
- Air Force Institute of Technology