American River Watershed Investigation, California. Volume 1. Appendixes A - E

Abstract

To insure that the planning studies addressed all potential problems, the Corps maintained continuous coordination with local sponsors, agencies affected by the project, and agencies directly involved in project studies. Formal coordination included presentations at meetings of the Executive Committee. The most extensive coordination, however, was accomplished through the Study Management Team meetings. The Corps initiated these meetings in February 1988 to discuss study results by the various agencies involved. The meetings encouraged the interchange of ideas and discussion of problems, and provided an opportunity for participation in project planning by the City and County of Sacramento and agencies not otherwise directly involved in the studies.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1991
Accession Number
ADA436965

Entities

Organizations

  • Sacramento District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Birds
  • Climate Change
  • Drainage Basins
  • Engineers
  • Environment
  • Environmental Protection
  • Fish
  • Flood Control
  • Flood Damage
  • Flood Hazards
  • Habitats
  • Health Services
  • Medical Personnel
  • Pumping Stations
  • Recreation
  • Warning Systems
  • Wildlife

Readers

  • Academic Conference Management
  • Archaeological Resource Survey
  • Systems Analysis and Design