American River Watershed Investigation, California. Volume 6. Appendix S. Part 1
Abstract
Our analysis of project impacts on fish and wildlife resources is based on a literature review; personal communication with recognized experts; field investigations and surveys; preliminary engineering and other information provided by the Corps; and a projection of future conditions using current land-use information and analysis provided by the Corps. Our analysis will not remain valid if the project, the resource base, or anticipated futures change significantly. This report is accompanied by separate substantiating reports for the three major segments of the American River Watershed Investigation: Auburn area, Lower American River area, and Natomas area.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1991
- Accession Number
- ADA436970
Entities
Organizations
- Sacramento District, U.S. Army Corps of Engineers