Back-Up Data for Temporary Staging for Shipyards
Abstract
This manual covers the back-up data necessary. for the final report.on. temporary staging. Areas included are (1). center tanks (2) wing tanks, (3) tank staging platform, (4) exterior shell, and (5) pipe staging.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1983
- Accession Number
- ADA444597