Recommended Process for Qualification Testing of Payload Software Prior to Use on Orbit
Abstract
This report defines the minimum required conditions necessary to qualify payload software prior to launch or use on orbit. The recommended approach is to complete full payload system (software, hardware, integration, and external interface) qualification prior to launch. If launch will take place before full payload qualification, then Core payload software functionality (i.e., bootstrap startup, spacecraft communications, system upload, hardware/software status reporting, and safing) must be fully qualified before launch. - Incremental upload of the software must be planned, architected, designed, and exhaustively tested. - Core software must be integrated and tested with all unqualified software using a qualified test environment prior to upload. In either case, full qualification of both core and basic (i.e., non-core) payload software must be complete before on-orbit use.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 20, 2006
- Accession Number
- ADA446912
Entities
People
- J. C. Cantrell
- R. L. Klungle
- S. J. Alvarado
Organizations
- The Aerospace Corporation