Diminishing Manufacturing Sources and Material Shortages Management Plan Guidance

Abstract

The following provides guidance for developing Diminishing Manufacturing Sources and Material Shortages (DMSMS) management plans and delineates the minimum information required for all levels of leadership to properly manage DMSMS. This guidance is not intended as a DMSMS tutorial. Additional background information can be obtained from the Defense Acquisition University or Department of Defense DMSMS Center of Excellence. Since programs vary in complexity and scope, this guidance does not provide a standard template or specific format; rather, it delineates essential requirements to be addressed when implementing a DMSMS program. Existing DMSMS management plans should be assessed against this guidance to ensure applicable items are addressed. Programs that have blocks or upgrades can document any unique requirements in appendices if the overall DMSMS management approach applies across all blocks or upgrades. In addition, programs that are used across multiple platforms (e.g. Tactical Air Navigation) need to ensure its DMSMS management programs are integrated with the host platform's DMSMS program. DMSMS management is an essential part of total life cycle system management. Implementation of the DMSMS management plan must begin with the concept design phase of a program and continue throughout its entire life cycle.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 2005
Accession Number
ADA449162

Tags

DTIC Thesaurus Topics

  • Abstracts
  • Acquisition
  • Air Navigation
  • Contracts
  • Cycles
  • Department Of Defense
  • Guidance
  • Information Operations
  • Instructions
  • Life Cycles
  • Manufacturing
  • Materials
  • Military Acquisition
  • Navigation
  • Procurement
  • Standards

Readers

  • Data Mining and Knowledge Discovery.
  • Database Systems and Applications
  • Defense Acquisition Program Management