The National Shipbuilding Research Program. 1989 Ship Oroduction Symposium. Paper No. 12: The First Time Integration of Product by Stage of Construction With Cost/Schedule Control Application

Abstract

There is nothing upon which shipbuilding managers and planning theorists are more solidly agreed than the need to optimize the integration of a steel hull with the maximum outfitting that can be achieved at a point in time that considers the facility material and available manpower, in other words, Opportunity.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1989
Accession Number
ADA452570

Entities

People

  • John J. Dougherty
  • Matthew Reid

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Assembly
  • Communication Systems
  • Construction
  • Contractors
  • Contracts
  • Control Systems
  • Engineering
  • Fabrication
  • Management Personnel
  • Manufacturing
  • Marine Systems (Military)
  • Organizational Structure
  • Production
  • Shipbuilding
  • Simulations
  • Standards
  • United States

Readers

  • Life Cycle Cost Analysis
  • Naval Architecture and Marine Engineering.
  • Systems Analysis and Design