The National Shipbuilding Research Program. 1989 Ship Oroduction Symposium. Paper No. 12: The First Time Integration of Product by Stage of Construction With Cost/Schedule Control Application
Abstract
There is nothing upon which shipbuilding managers and planning theorists are more solidly agreed than the need to optimize the integration of a steel hull with the maximum outfitting that can be achieved at a point in time that considers the facility material and available manpower, in other words, Opportunity.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1989
- Accession Number
- ADA452570
Entities
People
- John J. Dougherty
- Matthew Reid