Labor Standards Application Program, Phase 4 - FY-83, Blast and Paint Shops

Abstract

This report describes the development of labor standards during ship construction towards controlling production costs in the two closely related areas of blasting and painting. The overall objective of this Research Program is to reduce the cost of building ships. The objective of this specific project in the blast/paint areas was to improve planning, scheduling, production control, and worker productivity through the application of labor standards, and thereby reduce the cost of blasting/painting operations.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 28, 1984
Accession Number
ADA454573

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Air Pressure
  • Air Supplies
  • Application Software
  • Control Panels
  • Conveyors
  • Cost Effectiveness
  • Costs
  • Labor
  • Lead Time
  • Materials
  • Production
  • Production Control
  • Productivity
  • Scheduling (Production)
  • Spray Guns
  • Standards
  • Time Standards

Readers

  • Industrial Economics
  • Surface Coatings Technology.
  • Technical Research and Report Writing.