Initial Evaluation of the USNO Rubidium Fountain
Abstract
We discuss the first rubidium atomic fountain at the U. S. Naval Observatory, NRF1, which has been built as a prototype for future devices to be included in the USNO timescale. The system has demonstrated a short-term Allan deviation of 1.35 10 (-13) over tau(1/2) when measured against a hydrogen maser. We have directly compared NRF1's performance to that of our cesium fountain, NCF, demonstrating integration as 1 over tau(1/2) below 1 10(-15), and performance that is consistent with 7 10(-16) at 11 hours.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 2006
- Accession Number
- ADA457741
Entities
People
- C. R. Ekstrom
- S. Crane
- Steven Peil
- T. Swanson
Organizations
- United States Naval Observatory