Fort George G. Meade Ordnance Survey (1400 Acre Parcel)

Abstract

This interim report documents the results of the unexploded ordnance (UXO) survey of the B-1 subarea of the Tipton Army Airfield Area (TAAF) of Fort George G. Meade. The 100 percent surface and 10 percent subsurface UXO survey at the B-1 subarea has been completed. QA/QC has been conducted and results are satisfactory. The results of the B-1 subarea survey are discussed.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1992
Accession Number
ADA460491

Entities

People

  • Jim Pastorick

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force Facilities
  • Ammunition
  • Army
  • Army Corps Of Engineers
  • Base Closures
  • Contracts
  • Corporations
  • Hazardous Materials
  • Landing Fields
  • Metal Contacts
  • Munitions
  • New Jersey
  • Quality Control
  • Rocket Targets
  • Small Arms
  • Small Arms Ammunition
  • Unexploded Ammunition

Readers

  • Environmental Remediation and Restoration.
  • Military/Explosive Ordnance Disposal (EOD) Technology