Quarterly Groundwater Monitoring Third Quarter Sampling Results, Fort Dix, New Jersey
Abstract
Ten wells were selected for continued monitoring based on the first quarter sampling results. The wells were purged and sampled between September 19 and September 21, 1990 in accordance with procedures specified in the Draft Sampling and Analysis Plan (SAP), Fort Dix Follow-on Remedial Investigation/Feasibility Study, prepared by Dames & Moore. The sample containers were labeled, packed on ice in coolers, and shipped overnight with completed chain-of-custody forms to ESE for chemical analysis.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1991
- Accession Number
- ADA464300