Site Inspection at Fort Allen, Puerto Rico Preliminary Assessments at San Juan ASSF, Puerto Rico and Blair Hangar AASF, St. Croix, USVI
Abstract
This Management Plan has been prepared in accordance with Data Item A008 for the U.S. Army Environmental Center (USAEC) by ABB Environmental Services, Inc. (ABB-ES) in response to Delivery Order 0010 of Contract DACA31-94-D-0061 for a Site Inspection (SI) at Fort Allen in Juana Diaz, Puerto Rico and Preliminary Assessments (PAs) at the San Juan Army Aviation Support Facility (AASF) Puerto Rico, and Blair Hangar AASF on the island of St. Croix, USVI. The objectives of this Delivery Order are to conduct SIs at several areas of contamination (AOCs) and study areas at Fort Allen and to document the findings of the investigations. An additional objective is the completion of two PAs, at San Juan AASF and Blair Hangar AASF. The purpose of this Management Plan is to describe ABB-ES' organization, assignment of functions, duties and responsibilities, management procedures and policies, and reporting requirements for the completion of the work effort presented in the Accident Prevention Safety Program Plan (APSPP) and Quality Assurance Project Plan (QAPjP) (Data Item A004 and A006) and the Technical Plan (Data Item A003). Sections 2.0 and 3.0 of this plan describe the project management structure and controls to be used for this Delivery Order. Section 4.0 contains data management requirements which are specific to the Fort Allen SI. Costs and schedules will be monitored through the use of a detailed schedule and a Resource Utilization Plan (RUP) for each element in the Work Breakdown Structure (WBS). The project schedule and RUPs are presented in Sections 5.0 and 6.0, respectively. Descriptions of the reports to be prepared and delivered to the USAEC throughout the course of this project are presented in Section 7.0.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1996
- Accession Number
- ADA466066
Entities
People
- Joseph T. Cuccaro