Excavated Soils Management Plan for AOCs 44 and 52, Fort Devens
Abstract
This Excavated Soils Management Plan (ESMP) has been prepared by ABB Environmental Services, Inc. (ABB-ES), under contract to the U.S. Army Environmental Center (USAEC), for use in proposed cleanup activities at the Barnum Road Maintenance Yards (Areas of Contamination [AOCs] 44 and 52). The ESMP is a site-specific plan which is written to ensure that soil excavation, and handling, and final disposition procedures are followed in accordance with pre-approved guidelines.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1994
- Accession Number
- ADA467045