Quarterly Groundwater Monitoring First Quarter Sampling Results fort Dix, New Jersey

Abstract

The first quarter sampling activities included a reconnaissance survey to locate and inspect the wells at the landfill and to select those to be included in the Monitoring Program. As a result of the survey, two wells (MW-8 and WES-3), which were vandalized or otherwise damaged, were excluded from the Monitoring Program. The selected wells and some related data are listed in Table 1. The locations of the wells are shown in Figure 1. The wells were purged and sampled in accordance with procedures specified in the Draft Sampling and Analysis Plan (SAP), Fort Dix Follow-on Remedial Investigation/Feasibility Study, prepared by Dames & Moore. The sample containers were labeled, packed on ice in coolers, and shipped overnight with completed chain-of-custody forms to ESE for chemical analysis. The samples were analyzed for VOCS as well as for total and dissolved priority pollutant metals and iron. The analytical results are presented in Tables 2 and 3. Table 2 shows only the results for analyte concentrations above detection limits while Table 3 presents all analytical data.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 29, 1990
Accession Number
ADA467331

Entities

People

  • Mensa Nunyuie

Tags

Communities of Interest

  • Advanced Electronics

DTIC Thesaurus Topics

  • Chemical Analysis
  • Containers
  • Contracts
  • Detection
  • Feasibility Studies
  • Groundwater
  • Hazardous Materials
  • Maryland
  • Monitoring
  • New Jersey
  • Reconnaissance
  • Sampling
  • Waste Disposal Facilities

Readers

  • Analytical Chemistry
  • Environmental Remediation and Restoration.