Asbestos Survey for Fort Point US Coast Guard Station. Volume 1

Abstract

R.L. Stollar and Associates, Inc. (RLSA) conducted an asbestos survey and bulk sampling of materials at the Fort Point U.S. Coast Guard Station (FPUSCGS) buildings to delineate the location and extent of asbestos-containing materials (ACM) at the facility. The U.S. Coast Guard Station is located on Presidio of San Francisco property along the San Francisco Bay. The facility consists of nine buildings ranging in size from 108 square feet (sq ft) to 8,852 sq ft, totalling 20,905 square feet. The survey was conducted in accordance with procedures outlined in TM5-612, Asbestos Control. Assessment of friable ACM was made using the worksheets included in the Guide for Asbestos Hazard Assessment in U.S. Army Facilities. From damage/risk and exposure values obtained from these worksheets, recommended management corrective actions were determined.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1991
Accession Number
ADA468410

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Accuracy
  • Air Force
  • Army Facilities
  • Asbestos
  • Calibration
  • Coast Guard
  • Construction
  • Databases
  • Maintenance
  • Materials
  • Personal Protective Equipment
  • Personnel Management
  • Plastic Explosives
  • Protective Equipment
  • Quality Control
  • Standards
  • Test Methods

Readers

  • Environmental Remediation and Restoration.