Defense Acquisitions: Navy Faces Challenges Constructing the Aircraft Carrier Gerald R. Ford within Budget

Abstract

As a result of a substantial investment of time and money, the Navy has reduced the risks associated with a number of essential technologies, including the nuclear propulsion and electric plant. At this time, several technical risks that could lead to increased construction costs and potentially result in capability reductions still remain. In particular, the electromagnetic aircraft launch system (EMALS), the advanced arresting gear, and the dual band radar face key tests with little margin for resolving problems before they begin to disrupt the optimal CVN 78 construction schedule and increase ship costs. If key systems arrive late, more labor cost may be incurred because of inefficient work-arounds and schedule delays. EMALS and the advanced arresting gear are vital to meeting key capabilities and must be delivered to the shipyard on time to maintain the construction schedule. The dual band radar enables a smaller island structure on the deck of the carrier, facilitating the ship s increased sortie generation rate. All three systems have experienced schedule delays because of technical and other challenges. Demanding tests lay ahead for all three systems: " In November 2007, the EMALS program will begin testing a production-representative system, including a critical generator component that will be field-tested for the first time. " Land-based testing of a dual band radar prototype is expected to begin in December 2008, but will not demonstrate full power output critical to meeting requirements. Specific testing has not yet been planned for all carrier-unique capabilities, including a number of air traffic control scenarios. " Testing of the advanced arresting gear, including, for the first time, the software control system, is scheduled to begin in 2008.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 2007
Accession Number
ADA472282

Entities

People

  • Alyssa Weir
  • Diana Moldafsky
  • Karen Zuckerstein
  • Lisa L. Beradi
  • Moshe Scwhzart
  • Paul L. Fracnis

Organizations

  • United States Government Accountability Office

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Acquisition
  • Aircraft Carriers
  • Aircraft Nuclear Propulsion
  • Business Administration
  • Congress
  • Electromagnetic Aircraft Launch Systems
  • Engineers
  • Flight Decks
  • Ford-Class
  • Military Acquisition
  • Naval Warfare
  • Navy
  • Nimitz-Class
  • Nuclear Propulsion
  • Systems Engineering
  • Test And Evaluation
  • United States Government

Readers

  • Aerospace Engineering
  • Economics
  • Life Cycle Cost Analysis