Controlled Fragmentation of High Capacity Cylindrical Cased Charge
Abstract
A high capacity cased charge was detonated at Shoeburyness Proof and Experimental Establishment on 4th April 1950. The object of this trial was to determine the efficiency of control to approximately 1/32 oz fragments and to measure the velocity, angular distribution and penetration of such fragments. This note describes the results obtained.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1950
- Accession Number
- ADA474176
Entities
People
- R. G. Keats
Organizations
- Royal Aircraft Establishment