Power Converters
Abstract
This report summaries the work carried out under the current Matrix Converter contract. During this period the work on the project focused on two packages of work with the objective of furthering the work on the high power inverter at ARL. The first strand of this work involves using the TI C6713 control platform and the high power inverter to control of a generator for testing on the SIL. The second strand of work is focused on supporting the miniaturization of the control platform through interaction with a third party company and developing the required interfaces for testing the inverter and control platform at the SIL in order to control both the induction motor and the generator.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 30, 2008
- Accession Number
- ADA483216
Entities
People
- Andrew Trentin
- Jon Clare
- Lee Empringham
- Patrick Wheeler
Organizations
- University of Nottingham