Test Operations Procedure (TOP) 1-1-030 RAM-D and ILS Analysis
Abstract
This Test Operations Procedure (TOP) establishes guidelines to use when performing a reliability, availability, maintainability, durability (RAM-D) and/or integrated logistic supportability (ILS) analysis during developmental testing. This document is intended for use in assessing RAM-D and ILS characteristics of various types of materiel, including individual items and systems.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 08, 2008
- Accession Number
- ADA486429