Analysis of Contractor Logistics Support for the P-8 Poseidon Aircraft

Abstract

The end of service life of the P-3C Orion was quickly approaching with no replacement identified. The Navy's solution was the P-8A based on the Boeing 737-800 ERX. But decisions on the amount of contractor logistics support for the program remain.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 2008
Accession Number
ADA493933

Entities

People

  • Michael K. Martin
  • Scott Hedrick
  • Shane Tallant

Organizations

  • Naval Postgraduate School

Tags

Communities of Interest

  • Advanced Electronics
  • Biomedical
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Aircrafts
  • Contractors
  • Contracts
  • Education
  • Health Care
  • Life Cycle Costs
  • Life Cycles
  • Logistics
  • Logistics Support
  • Maintenance
  • Maintenance Personnel
  • Manpower
  • Navy
  • Training
  • Transport Aircraft
  • Websites

Readers

  • Aerospace Engineering
  • Maritime and Naval Warfare Studies
  • Systems Analysis and Design