Rabeaa Point of Entry Screening Facility Rabeaa, Iraq

Abstract

The objective of this project assessment was to provide real-time relief and reconstruction project information to interested parties to enable appropriate action, if warranted. Specifically, the Special Inspector General for Iraq Reconstruction (SIGIR) determined whether: 1. Project components were adequately designed prior to construction or installation; 2. Construction or rehabilitation is in compliance with the standards of the design; 3. Adequate quality management programs are being utilized; 4. Sustainability was addressed in the contract or task order for the project; and 5. Project results were or will be consistent with their original objectives. Contract W917BE-08-C-0066, a firm-fixed-price contract to Biltex Construction Company, Ankara, Turkey in the amount of $3,095,267. The project was funded by the Iraq Security Forces Fund. The contract contained three amendments and/or modifications: A00002, dated 2 June 2008, descoped the asphalt paving and replaced the paving with concrete road paving. The amendment to the scope of work did not affect the cost or time of the project. P00001, dated 16 December 2008, increased the contract amount by $14,320.66 from $3,095,267 to $3,109,587.66. The modification increased the size of the septic tank capacity in order to meet the needs of the facility?s public restrooms. Also, the modification accommodated the additional excavation of 20 linear meters from the original location for the Point of Entry (POE) 1 building foundations. In order to accomplish the tasks, the modification extended the period of performance by 20 calendar days, from 180 days to 200 days. P00002, dated 5 January 2009, extended the period of performance by 23 days for a total of 223 days from the Notice to Proceed dated 9 August 2008. The total cost of the project did not change.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 11, 2010
Accession Number
ADA514113

Entities

People

  • Angelina Johnston
  • Kevin O'connor
  • Shawn Sassaman
  • Todd Criswell

Organizations

  • Special Inspector General for Iraq Reconstruction

Tags

Communities of Interest

  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Army Corps Of Engineers
  • Business Administration
  • Concrete
  • Congress
  • Construction
  • Contractors
  • Contracts
  • Engineering
  • Engineers
  • Fuel Tanks
  • Governments
  • Materials
  • Quality Control
  • Standards
  • United States
  • Water Pumps
  • Water Tanks

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Facility/Structural Engineering.
  • Military and Counterinsurgency Studies.