Program Management Office, Medical Support Systems

Abstract

AMEDD Shelter History since DEPMEDS: Aging DEPMEDS system (approximately 25 years) * 1999 - Future Medical Shelter Systems (FMSS) born - CSI - ORD * 2001 - ORD withdrawn * 2003 Vertigo Air Beam Shelter Developed under FMSS + ISO potential replacements * 2004 - SG directs interim "shelter" needed * 2005 - Tent-off at Fort Polk * Alaska chosen - CSI supported (Vertigo not mil-spec tested or production ready) * 2006 - Force Provider adopts AMEDD developed Vertigo Air Beam shelter * 2006-2009 - MRMC is working with DCDD on new reqs using FP CPD, and potentially migrating requirements to PM Force Sustainment/Force Provider. Desire is to be the same as "big Army" and use shelter technology that MRMC helped develop under Future Medical Shelter System Program.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 07, 2009
Accession Number
ADA514487

Entities

People

  • Jaime Lee

Tags

DTIC Thesaurus Topics

  • Abstracts
  • Competition
  • Composite Materials
  • Composite Structures
  • Deployment
  • Engineering
  • Epoxy Resins
  • Fabrication
  • Honeycomb Cores
  • Information Operations
  • Logistics
  • Manufacturing
  • Materials
  • Production
  • Program Management
  • Resins
  • System Software

Readers

  • Clinical Trial Research.
  • Medical or Health Care Field.
  • Nuclear Civil Defense.