Comprehensive Energy and Water Master Plan, Redstone Arsenal

Abstract

The purpose of a Comprehensive Energy and Water Master Plan (CEWMP) is to evaluate the current energy and water uses of an installation, make recommendations to improve the current conditions and implement a plan to enact these recommendations. The CEWMP is directed by Installation Management Command (IMCOM) and designed to assist installations in satisfying the following: (1) Energy Policy Act (EPAct) of 2005; (2) Executive Order (EO) 13423; (3) Energy Independence and Security Act (EISA) of 2007. It also intends to address the recommendations provided by the following: (1) Army Energy and Water Campaign Plan (AEWCP) 2007; (2) American National Standards Institute 2000/Management System for Energy 2005 (ANSI/MSE 2000:2005). The CEWMP serves as a roadmap for how Redstone Arsenal (RSA) will meet and exceed the various provisions and mandates listed above.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 2009
Accession Number
ADA514920

Entities

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Business Administration
  • Control Systems
  • Electric Power
  • Energy Conservation
  • Energy Consumption
  • Energy Efficiency
  • Energy Management
  • Energy Production
  • Energy Systems
  • Environment
  • Fossil Fuels
  • Management Personnel
  • Measurement
  • Natural Gas
  • Organizational Structure
  • Renewable Energy
  • Water Supplies

Readers

  • Defense Acquisition Program Management
  • Energy Conservation and Renewable Energy Engineering.