Environmental Assessment for the Minuteman III Propulsion Replacement Program Hill Air Force Base, Utah

Abstract

The Air Force intends to execute the Propulsion Replacement Program (PRP) at Hill Air Force Base (AFB), Utah. The primary objective of the PRP is to extend the service life of the Minuteman III (MM III) missile. The project involves the refurbishment of 607 MM III motors from three wings: F.E. Warren AFB, Wyoming; Malmstrom AFB, Montana; and Minot AFB, North Dakota. The purpose of this Environmental Assessment (EA) is to review environmental impacts associated with the Full Rate Production phase (FRP) of the PRP contract as it relates to transport of the missile boosters, rocket motors, and progam operations at Hill AFB.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 2001
Accession Number
ADA515937

Entities

Organizations

  • URS Corporation

Tags

Communities of Interest

  • Biomedical
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Birds
  • Environmental Protection
  • Habitats
  • Health Services
  • Intercontinental Ballistic Missiles
  • Medical Personnel
  • Wildlife

Readers

  • Aerospace Test and Evaluation
  • Environmental Remediation and Restoration.
  • Software Engineering