Haditha Dam Perimeter Security Haditha, Iraq. Sustainment Assessment

Abstract

The objective of this project assessment was to provide real-time information on relief and reconstruction to interested parties to enable appropriate action to be taken, if warranted. Specifically, SIGIR determined whether the project was operating at the capacity stated in the original contract. To accomplish this, SIGIR determined whether the project was at full capability or capacity when accepted by the U.S. government, when it was transferred to Iraqi operators, and when SIGIR inspected the site.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 13, 2010
Accession Number
ADA518576

Entities

People

  • Angelina Johnston
  • Kevin O'connor
  • Shawn Sassaman
  • Yogin Rawal

Organizations

  • Special Inspector General for Iraq Reconstruction

Tags

Communities of Interest

  • Energy and Power Technologies
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Army Corps Of Engineers
  • Business Administration
  • Congress
  • Construction
  • Contractors
  • Contracts
  • Department Of Defense
  • Engineers
  • Governments
  • Logistics
  • National Security
  • Procurement
  • Quality Control
  • Security
  • Standards
  • Sustainment
  • United States

Readers

  • Military and Counterinsurgency Studies.