Humer Kwer Health Center Sulaymaniyah, Iraq. Sustainment Assessment
Abstract
The objective of this project assessment was to provide real-time relief and reconstruction project information to interested parties to enable appropriate action to be taken, when warranted. Specifically, the Special Inspector General for Iraq Reconstruction (SIGIR) determined whether the project was operating at the capacity stated in the original contract. To accomplish this, SIGIR determined whether the project was at full capability or capacity when accepted by the U.S. government, when it was transferred to Iraqi operators, and during SIGIR's on-site inspection.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 20, 2010
- Accession Number
- ADA520198
Entities
People
- Angelina Johnston
- Kevin O'connor
- Shawn Sassaman
Organizations
- Special Inspector General for Iraq Reconstruction