Energy Efficiency for Military Aircraft and Operations: Surveillance, Reconnaissance, Tanker

Abstract

This report results from a contract tasking Nangia Aero Research Associates as follows: The proposal is in two phases as mentioned in the above document. The scope of the work is fairly large and a judicious choice is implied in consultation with technical monitors at AFRL. Phase 1 is for total elapse time of about 4 months Phase 2 is 6 months Phase 3 is 6 months.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 2009
Accession Number
ADA521688

Entities

People

  • Rajendar K. Nangia

Tags

Communities of Interest

  • Air Platforms
  • Ground and Sea Platforms
  • Human Systems
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Aircraft Equipment
  • Aircrafts
  • Airframes
  • Cargo Aircraft
  • Commercial Aircraft
  • High Lift Devices
  • Jet Aircraft
  • Jet Transport Aircraft
  • Military Aircraft
  • Reconnaissance Aircraft
  • Transport Aircraft
  • Unmanned Aerial Vehicles

Readers

  • Systems Analysis and Design
  • Technical Research and Report Writing.