Fecal Coliform Model Verification Sampling Plan, Winter 2004. Addendum to the Fecal Coliform Total Maximum Daily Load Study Plan for Sinclair and Dyes Inlets

Abstract

This document presents the Winter 2004 Fecal Coliform (FC) model verification sampling plan prepared in support of the FC Total Maximum Daily Load (TMDL) Study Plan for Sinclair and Dyes Inlets, WA (TMDL Study Plan). The sampling plan describes specific sampling activities to obtain data necessary to verify the watershed and receiving water models being developed for FC fate and transport in Sinclair and Dyes Inlets and support the development of a water clean up plan for the Sinclair/Dyes Inlet watershed. This sampling plan has been revised to address comments received on the draft document (Appendix 12.1 Response to Comments from Ecology (M. Roberts) of 26 JAN 2004). This plan has been prepared by Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF) Project ENVVEST as an addendum to the TMDL Study Plan, and, unless otherwise noted, the data quality objectives, quality control/quality assurance (QA/QC) requirements, and sampling procedures identified in the TMDL Study Plan are applicable.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 19, 2004
Accession Number
ADA526765

Entities

People

  • Bruce Beckwith
  • C. W. May
  • J. M. Wright
  • R. K. Johnston
  • V. S. Whitney

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Birds
  • Calibration
  • Department Of State
  • Drainage Basins
  • Ecology
  • Flow
  • Food Safety
  • Health
  • High Density
  • Naval Shore Facilities
  • Naval Warfare
  • Puget Sound
  • Sampling
  • Verification
  • Waste Water
  • Water Flow
  • Water Quality

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Environmental Engineering
  • Environmental Remediation and Restoration.