Haditha Primary Healthcare Center, Haditha, Iraq. Sustainment Assessment

Abstract

SIGIR is assessing projects funded under the Iraq Relief and Reconstruction Fund. SIGIR did this assessment to determine if the original deficiencies identified in the pre-final inspection, such as poorly insulated duct work and plumbing issues, were corrected. The overall objective of the project was to complete the partially constructed Type A Haditha Primary Healthcare Center (PHC). This facility, when completed, was expected to relieve the overburdened outpatient care currently being provided by other area hospitals. The facility was partially completed by Parsons Delaware, Inc. prior to its termination in March 2006. At the time of termination, the facility was approximately 40% complete.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 28, 2009
Accession Number
ADA528674

Entities

Organizations

  • Special Inspector General for Iraq Reconstruction

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Army Corps Of Engineers
  • Construction
  • Contractors
  • Contracts
  • Dental Equipment
  • Governments
  • Health
  • Health Care
  • Health Services
  • Junction Boxes
  • Logistics
  • Materials
  • Medical Personnel
  • Power Supplies
  • Quality Control
  • Sustainment
  • United States

Fields of Study

  • Medicine

Readers

  • Facility/Structural Engineering.
  • Medical or Health Care Field.
  • Military and Counterinsurgency Studies.

Technology Areas

  • Microelectronics