Nassriya Water Treatment Plant Nassriya, Iraq. Sustainment Assessment

Abstract

The Office of the Special Inspector General for Iraq Reconstruction is assessing projects funded by the Iraq Relief and Reconstruction Fund to provide real-time relief and reconstruction information to interested parties to enable appropriate action, when warranted. This project sustainment assessment report is provided for your information and use. SIGIR assessed the operation of the Nassriya Water Treatment Plant to determine whether it was operating at the capacity planned in the delivery order design. This assessment was made to provide you and other interested parties with real-time information on a completed relief and reconstruction project to enable appropriate action to be taken, if warranted. The assessment team included an engineer/inspector and two auditors/inspectors.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 28, 2008
Accession Number
ADA528675

Entities

Organizations

  • Special Inspector General for Iraq Reconstruction

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Construction
  • Control Panels
  • Detectors
  • Drinking Water
  • Environmental Protection
  • Governments
  • International Organizations
  • Laboratory Equipment
  • Medical Personnel
  • Organizational Structure
  • Performance Tests
  • Public Health
  • Test And Evaluation
  • United States
  • United States Government
  • Water Purification
  • Water Supplies

Readers

  • Military and Counterinsurgency Studies.