Unified Facilities Criteria (UFC) Design Guide. Army Reserve Facilities
Abstract
This Design Guide contains design criteria and general requirements to be used in the development of designs for new construction and additions/alterations of U.S. Army Reserve (USAR) facilities. Its purpose is to serve as one means for the Using Service to convey functional and other criteria for Military Construction Army Reserve (MCAR) projects to the Design Agency charged with the planning and design of a facility. This Guide is also intended to aid in the formulation of project documentation for inclusion in military construction programs.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 2010
- Accession Number
- ADA530875
Entities
Organizations
- United States Department of Defense