Erbil City Transformers, Erbil, Iraq

Abstract

The objective of this project assessment was to provide real-time relief and reconstruction project information to interested parties in order to enable appropriate action, when warranted. Specifically, we determined whether: 1. Project results were consistent with original objectives; 2. Project components were adequately designed prior to construction or installation; 3. Construction or rehabilitation met the standards of the design; 4. The Contractor's Quality Control plan and the U.S. Government's Quality Assurance program were adequate; and 5. Project sustainability was addressed.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 12, 2006
Accession Number
ADA532210

Entities

People

  • Andrew Griffith
  • Timothy Baum

Organizations

  • Special Inspector General for Iraq Reconstruction

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Army Corps Of Engineers
  • Construction
  • Contractors
  • Contracts
  • Engineers
  • Foreign Relations
  • Governments
  • International Relations
  • Low Voltage
  • Maintenance
  • National Security
  • Power Distribution
  • Quality Control
  • Security
  • Standards
  • Transformers
  • United States Central Command

Readers

  • Military and Counterinsurgency Studies.
  • Software Engineering