Sheile Primary School, Dahuk, Iraq

Abstract

The objective of this project assessment was to provide real-time relief and reconstruction project information to interested parties in order to enable appropriate action, when warranted. Specifically, we determined whether: 1. Project results were consistent with original objectives; 2. Project components were adequately designed prior to construction or installation; 3. Construction or rehabilitation met the standards of the design; 4. The Contractor's Quality Control (CQC) plan and the U.S. Government's Quality Assurance (QA) program were adequate; and 5. Sustainability was addressed.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 05, 2006
Accession Number
ADA532212

Entities

People

  • Andrew Griffith
  • Timothy Baum

Organizations

  • Special Inspector General for Iraq Reconstruction

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Army Corps Of Engineers
  • Concrete
  • Construction
  • Construction Materials
  • Contracts
  • Education
  • Governments
  • Groundwater
  • International Relations
  • Maintenance Requirements
  • Materials
  • National Security
  • Quality Control
  • Security
  • Standards
  • Water Supplies
  • Water Tanks

Readers

  • Facility/Structural Engineering.