Al Balda Police Station, Hilla, Iraq

Abstract

The objective of this project assessment was to provide real-time relief and reconstruction project information to interested parties in order to enable appropriate action, when warranted. Specifically, we determined whether: 1. Project results are consistent with original objectives; 2. Project components were adequately designed prior to construction or installation; 3. Construction or rehabilitation met the standards of the design; 4. The Contractor's Quality Control (CQC) plan and the U.S. Government's Quality Assurance (QA) program were adequate; 5. Sustainability and operational effectiveness were addressed.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 27, 2006
Accession Number
ADA532222

Entities

People

  • Angelina Johnston
  • Michael Stanka

Organizations

  • Special Inspector General for Iraq Reconstruction

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Army Corps Of Engineers
  • Congress
  • Construction
  • Contractors
  • Contracts
  • Engineers
  • Financial Management
  • Foreign Relations
  • Fuel Tanks
  • Governments
  • International Relations
  • National Security
  • Operational Effectiveness
  • Quality Control
  • Security
  • Standards
  • United States Central Command

Readers

  • Facility/Structural Engineering.
  • Military and Counterinsurgency Studies.