MILITARY AND VETERANS DISABILITY SYSTEM: Preliminary Observations on Evaluation and Planned Expansion of DOD/VA Pilot

Abstract

In their evaluation of the IDES pilot, DOD and VA concluded that, as of February 2010, the pilot had (1) improved servicemember satisfaction relative to the existing "legacy" system and (2) met their established goal of delivering VA benefits to active duty and reserve component servicemembers within 295 and 305 days, respectively, on average. While these results are promising, average case processing times have since steadily increased - for example, for active duty servicemembers, the average has increased from 274 days in February 2010 to 296 days in August 2010. At 296 days, processing time for the IDES is still an improvement over the 540 days that DOD and VA estimated the legacy process takes to deliver VA benefits to servicemembers. However, the full extent of improvement of the IDES over the legacy system is unknown because (1) the 540-day estimate was based on a small, nonrepresentative sample of cases and (2) limitations in legacy case data prevent a comprehensive comparison of processing times, as well as appeal rates.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 18, 2010
Accession Number
ADA532581

Entities

People

  • Daniel Bertoni

Organizations

  • United States Government Accountability Office

Tags

DTIC Thesaurus Topics

  • Active Duty
  • Air Force
  • Air Force Facilities
  • California
  • Congress
  • Department Of Defense
  • Governments
  • Health Services
  • Hospitals
  • Medical Examination
  • Medical Personnel
  • Military Facilities
  • Observation
  • Organizational Structure
  • Test And Evaluation
  • United States
  • United States Government

Readers

  • Medical or Health Care Field.
  • Military Mobilization and Reserve Forces Studies.
  • Systems Analysis and Design