Environmental Assessment for Demolition of Buildings 113, 130, 141, (West Wing), 256, 257, and the Boresight Tower at New Boston Air Force Station, New Hampshire

Abstract

The proposed action evaluated in this environmental assessment (EA) is the demolition of Building 113 (radio equipment shelter), Building 130 (former waste water treatment plant), Building 140 (generator shelter), West wing of Building 141 (former Logistics building), Building 256 (fuel vault), Building 257 (fueling station), the Boresight Tower, removal of associated infrastructure and the addition of 500 square feet of pavement adjacent to Building 134. The action could start during late 2010 or spring of 2011 and should conclude by 2012. The proposed action is needed to eliminate operation and maintenance costs for unnecessary structures on New Boston Air Force Station (NBAFS).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 2010
Accession Number
ADA533757

Entities

People

  • Stephen Najjar

Organizations

  • 23rd Space Operations Squadron

Tags

Communities of Interest

  • Biomedical
  • Space

DTIC Thesaurus Topics

  • Air Force
  • Birds
  • Environmental Protection
  • Habitats
  • Lepidoptera
  • Medical Personnel
  • Radio Equipment
  • Water Resources
  • Wildlife

Fields of Study

  • Engineering

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.