Pipeline River Crossing. Al Fatah, Iraq
Abstract
We are providing this project assessment report for your information and use. We assessed the in-process construction work being performed at the Al Fatah Pipe River Crossing in Al Fatah, Iraq to determine its status and whether intended objectives will be achieved. This assessment was made to provide you and other interested parties with real-time information on a relief and reconstruction project underway and in order to enable appropriate action to be taken if warranted. The assessment team included an engineer and an auditor. We discussed the results of this project assessment with Project and Contracting Office and U.S. Army Corps of Engineers representatives who concurred with our conclusions. This report includes no recommendations that required management comments. Details are provided in the Conclusions section of this report.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 27, 2006
- Accession Number
- ADA533936
Entities
People
- Timothy P. Baum
Organizations
- Special Inspector General for Iraq Reconstruction