Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at the Dalles Dam, Spring 2010

Abstract

The compliance monitoring study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) for the U.S. Army Corps of Engineers, Portland District (USACE). The purpose of the study was to estimate dam passage survival at The Dalles Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and provide additional performance measures at the dam as stipulated in the Columbia Basin Fish Accords for yearling Chinook salmon and steelhead.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 2010
Accession Number
ADA538371

Entities

People

  • J. R. Skalski
  • T. J. Carlson

Organizations

  • Pacific Northwest National Laboratory

Tags

Communities of Interest

  • Air Platforms
  • Autonomy
  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Acoustic Detection
  • Army
  • Army Corps Of Engineers
  • Columbia River
  • Data Sets
  • Detection
  • Engineers
  • Fish
  • Fisheries
  • Monitoring
  • Probability
  • Rivers
  • Signal Processing
  • Survival
  • Three Dimensional
  • Travel Time
  • Universities

Fields of Study

  • Environmental science

Readers

  • Aquatic Ecology
  • Clinical Trial Research.
  • Theoretical Analysis.