Research Study of River Information Services on the US Inland Waterway Network

Abstract

During the third reporting period the cooperation partners mainly dealt with joint efforts to prepare the closure of the LOMA 1.0 project phase. The related activities comprised the review of documentation delivered by the supplier, the identification of open items and the planning of the acceptance procedures. Further the planning process for the LOMA 2.0 project did start with the review of the project schedule the review of the first technical specifications and an identification of improvements in the project management process. A common meeting with the system supplier has been planned and prepared for the week of May 9, 2011.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 2011
Accession Number
ADA544381

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Abstracts
  • Acceptance Tests
  • Agreements
  • Bodies Of Water
  • Classification
  • Contracts
  • Identification
  • Information Operations
  • Inland Waterways
  • Landforms
  • Project Management
  • Specifications
  • Standards
  • Teamwork
  • United Kingdom
  • Waterways
  • Workshops

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Systems Analysis and Design