Proactive DMSMS: Part of Integrated Systems Engineering & Life Cycle Product Support Planning
Abstract
There is a fundamental disconnect between technology maturity and sustainment maturity. This briefing looks at how to institute both strategic and tactical changes.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 30, 2011
- Accession Number
- ADA557639
Entities
People
- Robert Lamanna