How to Use Equipment Specifications to Predict Measurement Uncertainty An Example Using Tunnels A, B and C Data System
Abstract
This report illustrates a methodology for predicting data system measurement uncertainty using equipment specifications. The example presented is based on the data acquisition systems being built for Tunnels ABC. For this example, the measurement uncertainty is predicted for both voltage and force balance measurements. The analysis identified several error sources that could potentially prevent the system from meeting the requirements. Mitigation measures were identified that would enable the proposed system to meet the requirements.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 2012
- Accession Number
- ADA563026
Entities
People
- James L. Taylor
Organizations
- Arnold Engineering Development Complex