Preparing for PM2.5 Non-Attainment Conditions and Emission Offset Credits

Abstract

Hill Air Force Base was recently designated as nonattainment for Particulate Matter 2.5 micrometers or less (PM2.5). This designation carries many negative repercussions, including much more stringent compliance requirements for PM2.5. The Utah Department of Air Quality (UDAQ) is developing a SIP to outline how Hill must achieve compliance, but many requirements are a guess at this point. The best solution is to consider all possible compliance implications and strategies to prepare for the SIP outcomes. Most strategies include working with UDAQ to plead Hill's case and work in conditions favorable to Hill.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 2011
Accession Number
ADA564555

Entities

People

  • Dave Hansell

Tags

Communities of Interest

  • Biomedical
  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Conformity
  • Construction
  • Emission
  • Energy Security
  • Environment
  • Flight Simulators
  • Gas Turbines
  • Generators
  • Monitoring
  • National Security
  • Precursors
  • Security
  • Standards
  • Test Methods
  • Turbines

Readers

  • Archaeological Resource Survey
  • Internal Combustion Engine (ICE) Technology.
  • Systems Analysis and Design