The Fully Burdened Cost of Waste in Contingency Operations
Abstract
Background: The Sustain the Mission Project. Developed method for calculating the fully burdened cost of fuel and water in theater. Waste Project Purpose: Method to manage waste in contingency operations. Solid, hazardous, and medical waste. Create a tool for users. Test the method using the tool.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 2011
- Accession Number
- ADA566275
Entities
People
- Marc Kodack