Turning a DoD GOLD Leaf: BRAC 133 at Mark Center

Abstract

In 2005, the BRAC process mandated the move of many DoD offices from leased office space to secure sites that could meet DoD's high anti-terrorism security standards. BRAC-133 at Mark Center facility will be a new office complex in Alexandria, VA designed to house over 6,400 Department of Defense personnel. 1.8 million square feet of world class office space. Expected turnover September 2011. Project is being designed and constructed to achieve a U.S. Green Building Council, Leadership in Energy and Environmental Design (LEED), New Construction GOLD level-rating.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 2010
Accession Number
ADA566732

Entities

People

  • Crystall Merlino
  • Joanne Hensley

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Base Closures
  • Construction
  • Department Of Defense
  • Efficiency
  • Energy
  • Energy Efficiency
  • Energy Security
  • Environment
  • Mass Transportation
  • Materials
  • Renewable Energy
  • Security
  • Site Selection
  • Sites
  • Standards
  • Transportation
  • Waste Management

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Government Contracting/Procurement.
  • Military History of the United States in the 20th Century.

Technology Areas

  • Space