Air Vehicle Integration and Technology Research (AVIATR). Task Order 0003: Condition-Based Maintenance Plus Structural Integrity (CBM+SI) Demonstration
Abstract
This report summarizes recent progress made on the AVIATR contract Task Order 3, Condition Based Maintenance plus Structural Integrity - Basic Phase. Similar to previous progress reports for this project the organization of the report follows the Work Breakdown Structure, and specifically documents the progress during the current reporting period, September 2009 through March 2010 on the Demonstration task (WBS 1.1.2).
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 2010
- Accession Number
- ADA581363
Entities
People
- Christopher Davis
- Leroy Fitzwater
- Y. T. Torng
Organizations
- Boeing